Project Scheduling – Primavera P6 & MS Project
Baseline schedules for industrial, high-rise and residential projects, with structured WBS, logic links, total float and the critical path highlighted.
Progress Tracking – Primavera P6 & MS Project
Regular schedule updates with actual dates, % complete, baseline comparison and progress lines, identifying delays early so recovery actions can be taken before they affect completion.
Resource Planning – Primavera P6 & MS Project
Resource-loaded schedules for residential and high-rise projects in Primavera P6 and MS Project. Labour, equipment and materials are defined with limits and rates, and resource histograms compare planned demand against availability, so over-allocations show up early and the workload can be balanced.
Earned Value Management – Primavera P6 & MS Project
Earned value analysis for residential and high-rise projects, comparing planned value, earned value and actual cost by WBS. SPI, CPI, variances and S-curves measure schedule and cost performance and give early warning of delays and overruns.
Quantity Takeoff – PlanSwift & Bluebeam
Digital quantity takeoffs from architectural drawings, measuring areas, volumes, lengths and counts for cladding, finishes, ceilings and structural works.
Bill of Quantities – MS Excel
A detailed engineer’s estimate for a commercial project’s civil works, covering earthwork, piling, reinforcement, concrete, masonry and plaster, with itemised quantities, rates and amounts ready for tendering and budgeting.
Rate Analysis – MS Excel
Detailed unit rate build-ups for concrete, brickwork, plaster and flooring. Each rate is built from material, labour and formwork costs using standard factors and markups, so every rate is transparent and justified.
Cost Estimate & BOQ Summaries
Client-ready cost summaries for a shopping mall, an academic block, a factory complex and a school. Each one rolls up the detailed BOQ by work section into a single total, with the cost per square foot where useful. Every amount is linked to the BOQ and measurement sheets, so the summary updates automatically
Construction Agreement – Factory Building (Cost-Reimbursable)
A construction contract for a factory building, drafted on a cost-reimbursable basis with a 9% contractor’s fee. It covers scope of works, eligible and non-eligible costs, cost records and verification, payments, variations, time for completion, suspension, termination and dispute resolution.
Contract Agreement – Residential House Retrofitting (Lump Sum)
A contract for the structural repair of a residential house in DHA-III, Islamabad, worth PKR 3.53 million. It covers scope of work, contract price, completion time, each party’s obligations, work changes and termination. It comes with a priced BOQ (Annex B) and a milestone-based payment schedule (Annex C).